Processing Facility
Our new Processing Facility was completed in June 2014. The high standard of the facilities and finishes are apparent.
For an exclusive insight into our Processing Facility, you can watch a short movie by clicking the button below.
From egg storage to new offices and canteen facility’s, no opportunity has been missed to ensure that our new building will be an exciting place to work. The new facility is currently being fitted out with new egg breaking equipment. This will increase egg breaking capacity and with the newest technology allow us to produce new products.
Environmentally, the new facility uses grey water usage in toilet flushing, this allows us to reuse water from the roof taking less from the environment. Lighting within all of our manufacturing and storage facility’s is LED this uses a fraction of the power of normal tubular lighting, emits virtually no heat (great within the chilled storage area’s) and is virtually maintenance free.